PROJECT OVERVIEW
4M Solar successfully executed Phase I of a 60 kW industrial rooftop solar power project for JSW at the Ennore Terminal in Chennai. The project was designed to provide reliable and efficient renewable energy generation while helping reduce conventional grid electricity consumption and long-term operational energy costs.
The 60 kW installation was delivered on a complete turnkey EPC basis, covering site assessment, system design, structural planning, procurement, installation, electrical integration, testing, and commissioning. The solar system was carefully engineered to suit the industrial rooftop environment and ensure safe, stable, and efficient power generation.
As the first phase of the JSW Ennore solar initiative, this 60 kW installation established a strong foundation for expanding renewable energy capacity at the facility. The project contributes to lower energy costs, reduced carbon emissions, and greater adoption of clean energy within industrial operations.
SCOPE OF WORK
SITE IMAGES
CONCLUSION
The Phase I 60 kW solar installation at JSW Ennore Terminal demonstrates 4M Solar's capability to deliver reliable industrial rooftop solar solutions through end-to-end EPC execution. The project provides clean and efficient power generation while supporting reduced grid dependency, lower energy costs, and the facility's long-term renewable energy goals.